Engineering Resources

Engineering Tools

Use these calculators to get a first estimate of hot water demand, heating power and storage size for your project. Every result is an approximate figure to help prepare your enquiry; our engineers confirm the final selection.

Choose a tab below: Hot Water Demand estimates peak flow and storage from fixture counts; the Electrical, Gas/Boiler, Heat Pump and Solar tabs estimate heating duty for each heat source. Enter your own project values, then use “Attach to RFQ” to send the estimate with your enquiry. These are planning figures, not final equipment sizing.

FixtureQuantityHot water per fixture (L/h at 60 °C)Demand (L)
Bathtubs75.776
Showers283.9284
Bidet7.68
Private hand basin7.68
Public hand basin30.330
Kitchen sink113.6114
Pantry sink37.938
Service sink113.6114
Hot water demand estimate
Total demand

670 L

Demand after factor

168 L

Storage volume

200 L

Assumptions used
  • Building: Hotel (workbook fixture values at 60 °C)
  • Demand factor: 0.25
  • Storage tank capacity factor: 0.6
  • Storage rounded up to the next 100 L
  • Water specific heat: 4.19 kJ/kg·K
How it is calculated

Total demand = Σ(quantity × L/h per fixture) = 670 L

Demand after factor = 670 × 0.25 = 168 L

Storage volume = 168 × 0.6 = 100.5 L, rounded up to 200 L

Preliminary estimate only. Final selection requires engineering review.

Source: supplied HOT WATER DEMAND CALCULATION ASHRAE – FARASHA workbook, building table at 60 °C. Legacy fixture data predates modern low-flow fixtures; the estimate covers only the fixtures entered. All results are preliminary, not a final equipment selection.

Electrical heating estimate
Heat duty

11.6 kW

Electrical input

11.8 kW

Suggested heater stages

2 × 6 kW

Assumptions used
  • Water specific heat: 4.19 kJ/kg·K
  • Heater efficiency: 99 % (default 99 %)
  • Stage size: 6 kW
How it is calculated

Heat duty (kW) = 4.19 × Volume (L) × (T hot − T cold) ÷ 3600 ÷ recovery hours

Electrical input (kW) = heat duty ÷ (efficiency % ÷ 100)

Stages = electrical input ÷ stage size, rounded up

Preliminary estimate only. Final selection requires engineering review.

Gas / boiler heating estimate
Heat duty

46.6 kW

Boiler input

51.7 kW

Primary flow rate

4.00 m³/h

Assumptions used
  • Water specific heat: 4.19 kJ/kg·K
  • Boiler efficiency: 90 % (default 90 %)
  • Primary supply / return: 80 / 70 °C
How it is calculated

Heat duty (kW) = 4.19 × Volume (L) × (T hot − T cold) ÷ 3600 ÷ recovery hours

Boiler input (kW) = heat duty ÷ (boiler efficiency % ÷ 100)

Primary flow (m³/h) = heat duty ÷ (1.163 × (supply − return))

Preliminary estimate only. Final selection requires engineering review.

Heat pump estimate
Heat duty

23.3 kW

Assumptions used
  • Water specific heat: 4.19 kJ/kg·K
  • No simultaneous water draw or heat losses included
How it is calculated

Heat duty (kW) = 4.19 × Volume (L) × (T hot − T cold) ÷ 3600 ÷ recovery hours

Preliminary estimate only. Final selection requires engineering review.

Solar water heating estimate
Daily hot-water energy

139.7 kWh

Solar-covered energy

104.8 kWh

Remaining backup energy

34.9 kWh

Assumptions used
  • Water specific heat: 4.19 kJ/kg·K
  • Solar fraction: 75 %
How it is calculated

Daily hot-water energy (kWh) = V × 4.19 × (T hot − T cold) ÷ 3600

Solar-covered energy (kWh) = daily hot-water energy × (solar fraction % ÷ 100)

Remaining backup energy (kWh) = daily hot-water energy − solar-covered energy

Preliminary estimate only. Final selection requires engineering review.

Questions about the assumptions or need help selecting equipment? Contact our team.

Request a Quote
info@solathermgulf.com·+971 4 565 4263

Facility 83, Jebel Ali Industrial Area 1, Dubai, UAE

Equipment selection

Hot water and steam equipment for UAE projects

SOLATHERM manufactures SS316L hot water calorifiers in Dubai and supplies steam equipment with local project support. Review the relevant equipment page, then send your demand calculations, heating source and project details for selection.

Call NowWhatsAppRequest Quote